Showing posts with label Bayou. Show all posts
Showing posts with label Bayou. Show all posts

Thursday, June 20, 2013

Coast Guard: Shell Pipeline Spills Oil Into Houston Area Bayou

An estimated 50 barrels of oil spilled from a pipeline operated by a subsidiary of Royal Dutch Shell PLC into a waterway outside Houston, according to the U.S. Coast Guard.

Shell clean-up crews were working to clear the crude out of Vince Bayou, a waterway that connects to the Houston Ship Channel, which leads into the Gulf of Mexico, said Coast Guard Petty Officer Steven Lehman. The spill was contained but the total amount of oil was still being verified, Officer Lehman said.

"That's a very early estimate--things can change," Officer Lehman said.

On April 3, about 700 barrels were found to have leaked from the West Colombia pipeline because of an unknown cause, with up to 60 of those barrels emerging in the bayou, Shell spokeswoman Kim Windon said. The pipeline had been shut down and isolated on March 29 after alarms alerted the company that oil may have leaked from the line.

Copyright (c) 2013 Dow Jones & Company, Inc.

Generated by readers, the comments included herein do not reflect the views and opinions of Rigzone. All comments are subject to editorial review. Off-topic, inappropriate or insulting comments will be removed.

View the original article here

Thursday, February 21, 2013

Pryme Intersects Oil, Natural Gas Fractures at Turner Bayou Chalk Project

Pryme Energy disclosed Tuesday that the Rosewood Plantation 21H No.1 well has reached a total measured depth of 19,168 feet and has intersected a significant oil and gas bearing fracture system.

Green oil is being produced back to surface with the drilling mud and a 30 to 40 foot high natural gas flare is burning. The planned total depth of the well is 20,310 feet.

"While it has been good to see the intersection of multiple fractures to date, it is very encouraging tointersect something of significance as we did today," Pryme's Managing Director Justin Pettett said in a statement.

"Drilling has taken longer than originally planned and we remain focused on the importance of a positive result from this well and the impact it will have on the value of Pryme. We look forward to flow testing the well later this month," Pettett added.

The Turner Bayou project comprises approximately 80 square miles which have been imaged by a proprietary 3D seismic survey. Pryme has a 40 percent working interest in 25,029 acres in the Turner Bayou project and is initially targeting development of the Austin Chalk horizon. In addition to the Austin Chalk potential of the Turner Bayou project area, exploration drilling within Pryme's Turner Bayou leases has intersected the Tuscaloosa Marine Shale which is analogous to the prolific Eagle Ford Shale in South Texas.

Generated by readers, the comments included herein do not reflect the views and opinions of Rigzone. All comments are subject to editorial review. Off-topic, inappropriate or insulting comments will be removed.

View the original article here