Showing posts with label Delivers. Show all posts
Showing posts with label Delivers. Show all posts

Tuesday, February 19, 2013

Keppel FELS Delivers Two Jackups Ahead of Schedule

Keppel FELS, a subsidiary of Keppel O&M, revealed Monday that it has delivered two jackup rigs ahead of schedule, bagging it a combined bonus of $810,000 (SDG1.5 million).

Transocean Siam Driller was delivered 22 days ahead of schedule, while the second unit – AOD 1 – was delivered 29 days ahead of schedule. Both of the rigs were handed over to their respective owners at the end of January, a spokesperson with Keppel FELS confirmed.

Customized to meet Transocean's requirements, Siam Driller has been contracted to Chevron to work in offshore Thailand, while AOD 1 has been contracted to Saudi Aramco to work in offshore Saudi Arabia.

Siam Driller is built to the Super B Class Bigfoot design, but enhanced with larger spud cans so that it is suitable for drilling where soft soil is predominant. The rig is installed with offline stand building features in its drilling system package, which allows for simultaneous drilling and the preparation of drill pipes to take place. The Super B Class jackup is an enhanced version of the standard B Class; the former is able to drill to a depth of 35,000 feet.

AOD 1 is built to the standard B Class design. The jackup will be able to operate in water depths of 400 feet, drill to a depth of 30,000 feet and accommodate 150 people.

Meanwhile, Transocean has on order a second Super B Class jackup with Keppel FELS. The jackup, Transocean Andaman, is at present under construction and scheduled to be delivered in March this year.

Commenting on the company's performance, Keppel O&M’s Managing Director, Wong Kok Seng said in a statement: "With some 20 rigs to deliver in 2013, we are working hard to maintain our high standards of delivering on time, within budget and without incidents. Of the rigs to be delivered this year, 15 are built to our KELS B Class family of designs, four to our Super A Class design and one to our proprietary semisubmersible drilling tender design."

Quintella has reported on the upstream and downstream oil and petrochemicals markets from 2004. Email Quintella at quintella.koh@rigzone.com.

Generated by readers, the comments included herein do not reflect the views and opinions of Rigzone. All comments are subject to editorial review. Off-topic, inappropriate or insulting comments will be removed.

View the original article here

Saturday, January 26, 2013

BP Delivers First Gas Shipment to Israeli Offshore Buoy

BP Delivers First Gas Shipment to Israeli Offshore Buoy

JERUSALEM--BP PLC (BP.LN) began delivering liquefied natural gas to Israel via an offshore buoy Thursday to help meet Israel's energy needs until it begins production of local gas from an offshore field later this year, government officials said.

The buoy was built off the Israeli coast by government-owned Israel Natural Gas Lines Co. at a cost of 500 million shekels ($134 million).

The gas is meant to satisfy the needs of the state-owned Israel Electric Co. until at least April, when Israel's offshore Tamar reserve will begin supplying gas.

"This is an important step for guaranteeing Israel's energy independence," Uzi Landau, minister of energy and water resources, said at a ceremony Thursday as the first ship filled the buoy with gas.

The Israeli gas shortage follows the cancellation by East Mediterranean Gas Co. of its supply deal with Israel last year in the wake of political changes in Egypt and numerous attacks sabotaging its pipeline in the Sinai Peninsula.

Since 2008, Egypt had supplied Israel with about 40% of its energy needs, or about 1.7 million cubic meters of gas a year. Israel relied on the local offshore Yam Tethys reserve for the remaining 60%. But after the cancellation of the Egyptian deal, and the depleting of the Yam Tethys reserve, the electric company turned to more expensive sources of fuel, such as diesel, that pushed up electricity prices and forced Israel Electric to depend on government guarantees to issue more bonds.

The electric company hasn't disclosed how much it is paying BP for the gas, or how much gas it planned to buy.

"But the cost of the buoy is much higher than the gas," said Elad Krauss, energy sector analyst at Harel Finance Ltd. in Tel Aviv. "There is no savings by buying gas from the buoy over diesel for the next few months."

But Mr. Krauss said that although the buoy was a large investment, and will not be used on a regular basis after the local Tamar field begins to produce gas, it does offer stability and security to Israel's energy supply, something that has been lacking.

In the case that something goes wrong with Tamar, the buoy will allow foreign companies to supply gas to Israel, Mr. Krauss said. Currently, Israel only has one gas pipeline, the closed one from Egypt, which is unlikely to reopen in the near future.

Israel's offshore Tamar field contains 9 trillion cubic feet of gas and is scheduled to begin production later this year. Another larger offshore gas field, Leviathan, that contains 16 trillion cubic feet of gas is slated to begin production later this decade. These two fields will eventually meet all of Israel's gas needs and turn the country into a gas-exporter, although the government has yet to specify how much gas it will allow for export.

Israel Natural Gas Lines contracted Italy's Micoperi Marine Contractors to build the bouy, which can accept up to 3 million cubic meters of gas a year.

Copyright (c) 2012 Dow Jones & Company, Inc.

Generated by readers, the comments included herein do not reflect the views and opinions of Rigzone. All comments are subject to editorial review. Off-topic, inappropriate or insulting comments will be removed.

View the original article here

Friday, January 25, 2013

BP Delivers First Gas Shipment to Israeli Offshore Buoy

BP Delivers First Gas Shipment to Israeli Offshore Buoy

JERUSALEM--BP PLC (BP.LN) began delivering liquefied natural gas to Israel via an offshore buoy Thursday to help meet Israel's energy needs until it begins production of local gas from an offshore field later this year, government officials said.

The buoy was built off the Israeli coast by government-owned Israel Natural Gas Lines Co. at a cost of 500 million shekels ($134 million).

The gas is meant to satisfy the needs of the state-owned Israel Electric Co. until at least April, when Israel's offshore Tamar reserve will begin supplying gas.

"This is an important step for guaranteeing Israel's energy independence," Uzi Landau, minister of energy and water resources, said at a ceremony Thursday as the first ship filled the buoy with gas.

The Israeli gas shortage follows the cancellation by East Mediterranean Gas Co. of its supply deal with Israel last year in the wake of political changes in Egypt and numerous attacks sabotaging its pipeline in the Sinai Peninsula.

Since 2008, Egypt had supplied Israel with about 40% of its energy needs, or about 1.7 million cubic meters of gas a year. Israel relied on the local offshore Yam Tethys reserve for the remaining 60%. But after the cancellation of the Egyptian deal, and the depleting of the Yam Tethys reserve, the electric company turned to more expensive sources of fuel, such as diesel, that pushed up electricity prices and forced Israel Electric to depend on government guarantees to issue more bonds.

The electric company hasn't disclosed how much it is paying BP for the gas, or how much gas it planned to buy.

"But the cost of the buoy is much higher than the gas," said Elad Krauss, energy sector analyst at Harel Finance Ltd. in Tel Aviv. "There is no savings by buying gas from the buoy over diesel for the next few months."

But Mr. Krauss said that although the buoy was a large investment, and will not be used on a regular basis after the local Tamar field begins to produce gas, it does offer stability and security to Israel's energy supply, something that has been lacking.

In the case that something goes wrong with Tamar, the buoy will allow foreign companies to supply gas to Israel, Mr. Krauss said. Currently, Israel only has one gas pipeline, the closed one from Egypt, which is unlikely to reopen in the near future.

Israel's offshore Tamar field contains 9 trillion cubic feet of gas and is scheduled to begin production later this year. Another larger offshore gas field, Leviathan, that contains 16 trillion cubic feet of gas is slated to begin production later this decade. These two fields will eventually meet all of Israel's gas needs and turn the country into a gas-exporter, although the government has yet to specify how much gas it will allow for export.

Israel Natural Gas Lines contracted Italy's Micoperi Marine Contractors to build the bouy, which can accept up to 3 million cubic meters of gas a year.

Copyright (c) 2012 Dow Jones & Company, Inc.

Generated by readers, the comments included herein do not reflect the views and opinions of Rigzone. All comments are subject to editorial review. Off-topic, inappropriate or insulting comments will be removed.

View the original article here