Showing posts with label Drills. Show all posts
Showing posts with label Drills. Show all posts

Wednesday, July 17, 2013

Petroamerica Succesfully Drills Las Maracas in Colombia

Petroamerica Oil Corp. a junior oil and gas company operating in Colombia is pleased to announce the drilling results for its Las Maracas-9 well on the Las Maracas Field, Los Ocarros Block, Colombia .

The Las Maracas-9 well was drilled as an S-style well targeting the attic oil in the Gacheta reservoir up-dip from the Las Maracas-3 well. In order to target the Gacheta in an attic position the well trajectory was intentionally designed not to intersect the Mirador reservoir in the field.

The well encountered the top of the main Gacheta reservoir 16 feet higher (true vertical depth) than at the Las Maracas-3 well and a petrophysical interpretation of the wireline logs indicates 42 feet of net oil pay (true vertical depth) in the main Gacheta reservoir. The Las Maracas-9 well has been completed to produce from the Gacheta and the Tuscany 119 rig is expected to mobilise to drill the La Casona-2 appraisal well, followed by the Rumi-1 exploration well, on the El Eden Block .

The Las Maracas Field is currently producing approximately 9,000 bopd with a total field watercut of 5.5%. The permanent production facility is scheduled to be online by the end of May 2013.

Petroamerica holds a 50 percent participating interest in the Los Ocarros Block where the Las Maracas field is situated, and a 40 percent participating interest on the El Eden Block .

Generated by readers, the comments included herein do not reflect the views and opinions of Rigzone. All comments are subject to editorial review. Off-topic, inappropriate or insulting comments will be removed.

View the original article here

Monday, February 25, 2013

Target Drills Ahead in the Sydney-1 Well, Progresses Fairway Project

Target Energy said Wednesday that it is drilling ahead in the Sydney-1 well, after having successfully addressed a technical issue relating to a loss in circulation at 5,915 feet.

The company will be drilling ahead in the sidetrack well; it is aiming to reach a target depth of 7,415 feet.

Target revealed in January that it was experiencing problems with progressing in the Sydney-1 well. The company said in an earlier disclosure that it experienced issues with swelling shales and gravels in the shallower of the well section.

Sydney-1 is part of Target's onshore Fairway four-well program. The other three wells in the project are the Darwin-1, Darwin-2 and Darwin-3 wells.

Generated by readers, the comments included herein do not reflect the views and opinions of Rigzone. All comments are subject to editorial review. Off-topic, inappropriate or insulting comments will be removed.

View the original article here