Showing posts with label Opening. Show all posts
Showing posts with label Opening. Show all posts

Friday, July 19, 2013

Top Interior Official To Leave In June, Creating Key Opening

WASHINGTON - The Interior Department's second-in-command plans to leave the agency at the end of June, creating a high-level opening at the agency responsible for oil and natural gas production on U.S. lands.

David Hayes, the deputy secretary who served under former secretary Ken Salazar, announced his departure Tuesday.

Mr. Hayes surfaced earlier this year as one of many possible candidates who could replace Mr. Salazar, who stepped down earlier this month. The job has gone to former REI Chief Executive Sally Jewell.

Mr. Hayes will serve as a senior fellow at the Hewlett Foundation, a non-profit group that awards grants to address environmental problems, and will teach at Stanford Law School.

Copyright (c) 2013 Dow Jones & Company, Inc.

Generated by readers, the comments included herein do not reflect the views and opinions of Rigzone. All comments are subject to editorial review. Off-topic, inappropriate or insulting comments will be removed.

View the original article here

Tuesday, June 25, 2013

Opening: Derrickman

Posted on Tuesday, October 11th, 2011 at 6:18 pm

Responsible for working board during tripping operations; mixes chemicals and oversees pit and mud pump operations. Must be able to perform all duties needed to rig-up, drill, rig-down and maintain rotary equipment.


View the original article here

Saturday, June 22, 2013

Opening: Motorman

Posted on Tuesday, October 11th, 2011 at 6:18 pm

Responsible for working board during tripping operations; mixes chemicals and oversees pit and mud pump operations. Must be able to perform all duties needed to rig-up, drill, rig-down and maintain rotary equipment.


View the original article here

Friday, May 24, 2013

Opening: Driller

Posted on Tuesday, October 11th, 2011 at 6:17 pm

Has basic knowledge of drilling an oil or gas well; Responsible for operating the rig in a safe manner within the limits of the rig’s equipment. Supervises rig and crew while on tour.


View the original article here

Opening: Floorhand

Posted on Tuesday, October 11th, 2011 at 6:18 pm

Works rig floor. Must be able to perform all duties needed to rig-up, rig-down and maintain rotary equipment.


View the original article here

Thursday, May 23, 2013

Opening: Derrickman

Posted on Tuesday, October 11th, 2011 at 6:18 pm

Responsible for working board during tripping operations; mixes chemicals and oversees pit and mud pump operations. Must be able to perform all duties needed to rig-up, drill, rig-down and maintain rotary equipment.


View the original article here

Wednesday, May 22, 2013

Opening: Motorman

Posted on Tuesday, October 11th, 2011 at 6:18 pm

Responsible for working board during tripping operations; mixes chemicals and oversees pit and mud pump operations. Must be able to perform all duties needed to rig-up, drill, rig-down and maintain rotary equipment.


View the original article here

Opening: Rig Manager

Posted on Tuesday, October 11th, 2011 at 6:17 pm

Responsible for daily rig functions, crew, and performance results, including the hiring and terminating of employees. Must be available for technical advice for any problems that might arise during completion of the well.


View the original article here

Wednesday, January 9, 2013

Opening: Driller

Posted on Tuesday, October 11th, 2011 at 6:17 pm

Has basic knowledge of drilling an oil or gas well; Responsible for operating the rig in a safe manner within the limits of the rig’s equipment. Supervises rig and crew while on tour.


View the original article here

Opening: Motorman

Posted on Tuesday, October 11th, 2011 at 6:18 pm

Responsible for working board during tripping operations; mixes chemicals and oversees pit and mud pump operations. Must be able to perform all duties needed to rig-up, drill, rig-down and maintain rotary equipment.


View the original article here

Opening: Derrickman

Posted on Tuesday, October 11th, 2011 at 6:18 pm

Responsible for working board during tripping operations; mixes chemicals and oversees pit and mud pump operations. Must be able to perform all duties needed to rig-up, drill, rig-down and maintain rotary equipment.


View the original article here

Opening: Floorhand

Posted on Tuesday, October 11th, 2011 at 6:18 pm

Works rig floor. Must be able to perform all duties needed to rig-up, rig-down and maintain rotary equipment.


View the original article here

Tuesday, January 8, 2013

Opening: Rig Manager

Posted on Tuesday, October 11th, 2011 at 6:17 pm

Responsible for daily rig functions, crew, and performance results, including the hiring and terminating of employees. Must be available for technical advice for any problems that might arise during completion of the well.


View the original article here