Saturday, February 2, 2013

Transocean Rig Arrives to Complete Timon Well

Valiant Petroleum announced Friday that the Transocean John Shaw (DW semisub) rig has arrived on location to complete the drilling of the Timon prospect in the UK's northern North Sea.

The Timon well (211/11b-7), located in blocks 211/11b and 211/16b, originally spud in May 2012 before being suspended due to operation problems with the previous drilling rig. The well is now expected to take around 40 days to complete.

Timon is an Upper Jurassic sand play with gross prospective resources estimated at 30 million barrels of oil equivalent.

The partners in the P1633 license, which covers the 211/11b and 211/16b blocks, are MPX North Sea (operator, 15 percent), Agora Oil & Gas UK (25 percent), TAQA Bratani (18 percent), Wintershall E&P (17 percent), Sorgenia E&P (15 percent) and Valiant (10 percent).

Generated by readers, the comments included herein do not reflect the views and opinions of Rigzone. All comments are subject to editorial review. Off-topic, inappropriate or insulting comments will be removed.
For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit http://www.riglogix.com/.

View the original article here

0 comments:

Post a Comment