Thursday, March 21, 2013

Songa Trym Maintenance Work Finally Completed

Rig operator Songa Offshore announced Monday that maintenance work on, and client acceptance testing of, its Songa Trym (mid-water semisub) rig is now complete. The rig is now on standby while Songa's client, Statoil, undertakes a planned upgrade of its mud system.

Songa Trym will then embark on a three-plus-two year contract with Statoil under direct Songa Offshore management.

Songa said that it was passing an "important milestone" with the Songa Trym finally on contract, with all rigs now operational.

Songa also announced Monday that it has appointed Bjørnar Iversen as new president of Songa Rig AS. Iversen, who is currently CEO at Odfjell Galvão in Brazil, will assume overall responsibility for Songa Rig's commercial relationship with Statoil on the Norwegian Continental Shelf.

A former engineer, Jon is an award-winning editor who has covered the technology, engineering and energy sectors since the mid-1990s. Email Jon at jmainwaring@rigzone.com.

Generated by readers, the comments included herein do not reflect the views and opinions of Rigzone. All comments are subject to editorial review. Off-topic, inappropriate or insulting comments will be removed.
For More Information on the Offshore Rig Fleet:
RigLogix can provide the information that you need about the offshore rig fleet, whether you need utilization and industry trends or detailed reports on future rig contracts. Subscribing to RigLogix will allow you to access dozens of prebuilt reports and build your own custom reports using hundreds of available data columns. For more information about a RigLogix subscription, visit http://www.riglogix.com/.

View the original article here

0 comments:

Post a Comment